Skip to main content
All calculators

Construction Cost Calculator

Estimate a construction budget from floor area, your entered unit cost and separate project allowances.

Your construction costs

Use the same floor-area definition as your entered rate.

Enter your own rate, including any tax payable.

Costs outside the rate

Add site preparation only when excluded from the entered rate.

Include remaining exclusions once, such as landscaping or fencing.

Contingency

Applies to the main build and all separately entered project costs.

View your budget

Your construction budget

Example inputs
Indicative project budget
$665,500
Main construction
$550,000
Additional project costs
$55,000
Contingency allowance
$60,500

Itemised budget

CostAmount
Area × entered rate$550,000
Site works$20,000
Service connections$8,000
Professional fees$15,000
Approvals$5,000
Other project costs$7,000
Subtotal before contingency$605,000
Contingency$60,500
Project budget$665,500

Build Cost From Area and Unit Cost

This construction cost calculator multiplies your floor area by your entered cost per square metre, then adds separate project costs and contingency. Use it as a preliminary house cost estimator before replacing allowances with itemised quotes.

Match the measurement behind the rate. A rate based on total covered area needs the corresponding area, including any garage or covered outdoor space counted in that rate. A living-area rate needs the matching living area.

Record the area definition and what the rate includes in the finance file. Enter amounts including any tax payable. The calculator adds no tax separately and supplies no market cost bands.

The starting figures are a fictional example. An area of 220 square metres at $2,500 per square metre gives $550,000 in main construction costs. These inputs describe the example only.

Site Works and Other Project Costs

Add costs outside the entered build rate once. Separate site preparation from service connections, then enter professional fees and approval charges. Use other project costs for remaining exclusions.

If the build rate includes $20,000 of site preparation, leave the separate site works line at $0. Adding $20,000 there again counts the same work twice. A blank extra cost line means it has been excluded, while $0 records that no extra allowance applies.

In the fictional example, site works of $20,000 and connections of $8,000 sit outside the main build. Professional fees of $15,000, approvals of $5,000 and other costs of $7,000 bring additional costs to $55,000.

The $605,000 subtotal attracts the entered 10% contingency of $60,500, producing a $665,500 project budget. This model applies contingency to the main build and all added costs. Choose the percentage for the project, including whether any entered allowance already contains a reserve.

The Victorian Government’s guidance on unexpected building costs explains contingency and contract exclusions. The Australian Government’s guide to building a house covers comprehensive quotes and allowances for unexpected work.

Land purchase, finance costs and accommodation during the build are excluded unless you add them to other project costs. Demolition and replacement-project costs belong in the knock down rebuild calculator linked below.

Reconcile With the Finance File

Compare the preliminary budget with the signed building contract and its inclusions, then account for costs outside that contract. Keep the lender’s valuation separate from the cost estimate. Neither figure establishes finance approval.

Reconcile the project budget with cash the client can contribute and lending available for these costs. For example, $100,000 cash plus $550,000 proposed project lending is $15,500 below the fictional $665,500 budget.

That comparison assumes the lending is available for this project after any existing debt payout. Record any funding shortfall and when the client must contribute cash. A total that balances does not establish that funds are available at each payment stage.

CommBank’s construction loan guidance describes staged payments against completed work. Use the actual lender’s evidence and drawdown rules alongside the contract and valuation when preparing the file.

The estimate is an entered-cost budget, separate from a builder’s quote or lender assessment. Your entries stay in this page and reload restores the fictional example.